SUPPORTING THE CLIENT`S CONSERVATION EFFORTS, GENALTA POWER BUILT THE GALLOWAY POWER PLANT TO CONSUME SOUR SOLUTION GAS FROM A HEAVY OIL FIELD.

 

Project Name: Galloway      

Project Type: Solution Gas to Power

Location: Peace River, AB

Size: 4 MW             

In-Service Date:  Spring 2013

The Galloway Generating Facility was constructed as an addition to the 2012 Cadotte plant. Using the same generating technology, the Galloway facility at the time of commissioning allowed Genalta to double the amount of gas being conserved in the area.